Lewisville Office Allocation and Land Utilization Study
The City of Lewisville sought Parkhill’s expertise to develop a long-range facility master plan for their municipal buildings. The goal: to use data to drive design decisions, optimizing resources, and preparing for future growth.

Predictive Analytics at Work
The project began with a thorough facility condition assessment and benchmarking analysis, using predictive analytics to forecast space needs and ensure functional adequacy. Parkhill worked closely with city departments, including the Police Department, to project staffing needs based on Lewisville’s anticipated growth.
Building for Tomorrow
These projections were refined through peer analysis of neighboring police departments, ensuring the plan was tailored to Lewisville’s unique challenges. The result is a comprehensive, flexible master plan that balances current needs with long-term vision, ensuring Lewisville’s municipal facilities are equipped for the future.
