Nebraska Furniture Mart Roadway Design

Designing Connected Infrastructure to Improve Mobility and Support a Growing Commercial Destination

Transforming 400 acres into a thriving commercial destination takes more than new buildings. It requires a transportation network that keeps people and businesses moving. For the Nebraska Furniture Mart development, Graham Associates, now part of Parkhill, designed an integrated roadway system to improve accessibility, accommodate increased traffic and support long-term growth. The project brings together new arterial roads, expanded intersections, bridges and pedestrian connections, creating a coordinated network that serves drivers, cyclists and pedestrians while laying the groundwork for future development.

Location
The Colony, TX, United States
default

Creating Connections at Every Turn

The design includes three miles of new four- and six-lane roadways, a widened Plano Parkway and eight traffic signals. A divergent diamond interchange, railroad bridge and pedestrian underpass improve circulation, while sidewalks and a hike-and-bike trail provide additional ways to navigate the growing commercial area.

Engineering Beyond the Roadway

Beneath the surface, extensive water, sanitary sewer and storm drainage improvements support the transportation network. A gravity-fed sewer crossing beneath the railroad eliminated the need for a lift station, demonstrating how thoughtful engineering can simplify infrastructure while improving long-term efficiency.

default
default

Finding Smarter Ways Forward

Strategic planning helped reduce costs and accelerate construction. Reusing on-site soil minimized material expenses, while phased environmental permitting kept work moving without interruption. A carefully coordinated construction sequence shortened the schedule by three months and reduced costs by approximately 10%, delivering greater value while supporting the area’s continued growth.