As new businesses and development transformed the area along SH 121, the need for better traffic flow and accessibility became increasingly important. Described as the first of its kind in Texas, the South Colony Boulevard Divergent Diamond Interchange is designed to help keep pace with that growth. By rethinking how vehicles move through the intersection, the design increases roadway capacity and improves access to major commercial destinations. The project also incorporates new roadways, a widened Plano Parkway, a 205-foot bridge over the BNSF railroad and a 100-foot pedestrian underpass.

A Different Approach to Traffic Flow
The divergent diamond design guides vehicles across to the opposite side of the roadway at signalized intersections, simplifying left turns and reducing potential conflict points. This innovative configuration helps traffic move more efficiently while improving connections throughout the growing commercial corridor.
Solving Challenges Below the Surface
Complex railroad crossings, utilities and environmental requirements called for creative coordination. A gravity-fed sanitary sewer crossing beneath the railroad eliminated the need for a lift station, while carefully phased environmental permits helped construction move forward without interruption.


Building Smarter, Saving More
Thoughtful construction planning delivered significant cost and time savings. Reusing on-site soil reduced construction expenses, while strategic phasing shortened the schedule by three months and lowered overall costs by approximately 10%. Together, these practical design solutions improved efficiency and delivered lasting value for a growing community.