El Paso Water
- construction services
- El Paso, Texas
Project Scope
1,600 linear feet of 42-inch CIPP, 2800 LF of 42-inch and 48-inch open cut
Construction Type
Rehabilitation
Project Delivery Method
Fast track
Project Components
CIPP (42 inch), rehabilitation and new installation of manholes, paving, open-cut pipe insulation (42 inch and 48 inch)
After a heavy storm in July 2017, El Paso Water experienced issues with a segment of their system in Northwest El Paso. Parts of the system comprised of corrugated metal pipe had corroded over its 30-year life. The large areas of deterioration were in dire need of repair.
The existing line was located on Belvidere Avenue and crossed Westwind Drive, two heavily traveled arterial roads in El Paso. Belvidere has a center turning lane, and Westwind has a divided median. Both roads are four-lane roadways.
Due to the volume of traffic on these roads and the potential impact on motorists by closing the intersection, El Paso Water asked Parkhill to determine if trenchless technologies would be the best solution for the 48-inch Emergency Repair project. After an initial evaluation, Insituform Technologies was selected based on cost, production rate, and ability to maintain as much of the original diameter as possible.
Because of the fast-track schedule, the project required close coordination with the El Paso Water operations staff and with the City of El Paso for traffic control and El Paso Water operations staff. The duration from initiation of the project to final completion was about six months.