Architecture
Engineering
Close
Category: Engineering
Written By: Nicole McBride
Date: December 23, 2020
A form for one of the splayed columns
Several layers of rebar inside the concrete structure
The “Bird Tail” before installation of rebar
“The Bird Tail” was designed by Parkhill's Structural Team.
The splayed columns required careful structural engineering design.
“The Bird Tail“ is located on the east side of Buddy Holly Hall.
The City of McKinney celebrated the grand opening of its new Municipal Complex on April 19, 2025, with a ribbon-cutting...
The W.A. Minter house is 100 years old! In that time, many have called the house “home.” The first residents of the...
Parkhill is pleased to announce that Ryan Kennerly, PE has been promoted to Director of Water Resources, and Mark Aaron...
Choose a topic