Akkerman News: TBM Provides Versatility in Difficult Ground for Water Conveyance Tunnel

Category: Engineering

Written By: Nicole McBride

Date: October 18, 2019

Akkerman News: TBM Provides Versatility in Difficult Ground for Water Conveyance Tunnel cover image
text

The new 66-inch pipe was installed by an Akkerman tunnel boring machine which El Paso Water, the project owner, nicknamed “Robbie” at the beginning of the project.